AIP Supplement Belgium and Luxembourg


SUP

018/2024

Effective from 18 APR 2024

Published on 04 APR 2024

  ELLX - Obstacles due to Construction Work

1   General

Construction works are taking place at Luxembourg Airport for the new “Skypark Business Center” building. The works are located right next to and on the western side of Terminal A.

The works have started in November 2020 and are now in phase 3.

To complete the works, four fixed cranes operate on the “Skypark” construction site.

2   Phase 3

Phase 3 has started as of mid-February 2022 and is expected to last until the end of 2024.

CRANESLATITUDELONGITUDEHEIGHT AGL
(M)
HEIGHT AGL
(FT)
ELEVATION AMSL
(EGM 2008) (M)
JIB (M)OLS PENETRATION (FT)
G3493801N0061250E74.50244.41443.7456.8095.00
G5493800N0061245E66.02216.58435.2651.8067.18
G6493759N0061243E55.67182.63424.9141.8033.22
G7493758N0061241E74.50244.41443.7451.8095.00

Crane G1 has been disassembled in March 2023.

Crane G2 has been disassembled in July 2023.

Crane G4 has been disassembled in January 2024.

Crane G3 and G5 (phase 3 of construction) disassembly date TBD.

Cranes G6 and G7 (phase 3 of construction) are expected to be disassembled by the end of 2024.

3   Impact on Obstacle Clearance Altitudes (OCA)

Due to the height of the cranes, the OCA has been temporarily increased for the following IAP:

IAPNew OCA (FT)
RNP RWY 24 LNAV/VNAV CAT D1617
RNP RWY 06 LPV CAT D1358
RNP RWY 06 LPV CAT DL1360
ILS CAT I RWY 06 CAT D1358
ILS CAT I RWY 06 CAT DL1360
LOC RWY 06 ALL CAT 1600

AIP SUP 010/2024 is hereby cancelled.